Image
Description
Installation of the 3rd line of short pasta with a capacity of 70 tons per day.
Obtaining ISO 14001 certification.
Title
2008
Installation of the 3rd line of short pasta with a capacity of 70 tons per day.
Obtaining ISO 14001 certification.